Raw Material: | Synthetic Rubber |
---|---|
Material: | Silicone Rubber |
Appearance: | Transperant |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Item | Testing Method | Unit | SR6450UFR | SR6470UFR |
1Mechanical properties,1.1 after single curing at 175ºC×5Min | ||||
Density | ASTM D792 | g/cm3 | 1.49 | 1.52 |
Hardness(Shore A) | ASTM D2240 | 52 | 72 | |
Tensile Strength | ASTM D412 | Mpa | 6.7 | 7.2 |
Elongation | ASTM D412 | % | 380 | 175 |
Type of flame retardancy | / | / | Halogen-free | Halogen-free |
Grade of flame retardancy | UL 94-2018 | / | V0 | V0 |
Grade of environmental protection | ROSH 2.0 | / | PASS | PASS |
2 Mechanical properties, 2.1 after thermal ageing at 200ºC×4H | ||||
Hardness (Shore A) | ASTM D2240 | 53 | 72 | |
Tensile Strength | ASTM D412 | MPa | 6.2 | 6.5 |
Elongation | ASTM D412 | % | 360 | 150 |
Compression Set 175×22H×25% Type A |
ASTM D395 Method B |
% | 25 | 24 |
2Mechanical properties,2.2after thermal ageing at 225ºC×70H | ||||
Hardness (Shore A) | ASTM D2240 | 57 | 75 | |
Tensile Strength | ASTM D412 | MPa | 4.5 | 4.6 |
Elongation | ASTM D412 | % | 150 | 120 |
Q: Are you a factory or trading company?
A: We are rubber raw material manufacturer and owned 3 factories.
Q: Where is the loading port and How do you ship the goods?
A: Our factory is nearby Shanghai Port, but loading port can be negotiated. We could ship by sea, by air or by express(EMS, UPS, DHL, TNT, FEDEX and etc). Please confirm with us before placing orders.
Q: How can we guarantee the products' quality?
A: All the products must be tested refers to key specifications during the production and final inspection before shipment.
Q: What about the lead time?
A: It depends on the order quantity you place the order. Usually sample needs 5-8 working days, mass production needs 15-30 days.
Suppliers with verified business licenses