We promise |
All customer-centric, never for short-term profit, and sell long-term benefits |
We produce |
Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration |
Pls provide |
2D,3D,samples, or the size of the multi-angle pictures |
Mould Time |
20-35 Days |
Product time |
7-15 Days |
Mould precision |
+/-0.01mm |
Mould life |
50-100 million shots |
ProducingProcess |
Audit drawings - mold flow analysis -design validation -Custom Materials - moldprocessing-core processing -electrodemachining -Runner system processing - parts processing and procurement - machiningacceptance -cavity surface treatment process-complex mode Die - The entire mold surface coating - Mounting plate - mold samplesample test-sending samples |
Mould cavity |
One cavity, multi-cavity or same different products be made together
Mould |
Mould material |
P20,2738,2344,718,S136,8407.NAK80,SKD61.H13 |
Runner system |
Hot runner and cold runner |
Base material |
P20.2738.2344.718.S136.8407.NAK80.SKD61.H13 |
Finish |
Pitting the word, mirror finish, matte surface, striae |
Standard |
HASCO, DME or dependent upon |
Main technology |
Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc. |
Software |
CAD.PRO-E.UG Design Time: 1-3 days (normal circumstances) |
Product material |
ABS,PPPC,PA6.PA66.TPU.POM,PBTPVC.HIPS,TPE.PCIABS, TPV, TPO,TPR.EVA.HDPE.LDPE.CPVC.PVDEPPSU. |
Quality system |
ISO9001:2008 |
Establish time |
20days |
Equipment |
CNC,EDM.Cutting off Machine,plastic machinery,etc plastic suitcasemould zhejiang |