Battery Type: | Lithium Battery |
---|---|
Motor: | Brushless |
Frame Material: | Steel |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Electric Bicycle Long Range Enduro Bomber Electric Bike 8000w Ebike
Frame
|
Enduro frame steel (black or white for choose) |
Handlebar/stem | Aluminum Alloy, 740mm Length/Aluminum 31.8*60mm fixed |
Throttle | Half twist throttle |
Motor
|
72V 8000W QS rear hub motor
|
Battery
|
72V 38.4AH Lithium Battery
|
Charger
|
6.5A Battery charger
|
Display
|
UKC1 Colorful Display
|
Controller | Leili 72V 100A controller (sine wave , unprogram) |
Front fork
|
ZOOM front fork
|
Rear shocx | KKE rear shocx in 1250Lbs or DNM RCP-2S rear shocx for choose |
Brake System
|
Tektro HD E725 4 Piston Hydraulic brake system with DISC
|
Freewheel
|
Singe freewheel gears |
Chain
|
KMC stainless steel
|
Saddle
|
Bicycle seat or Motorcycle seat for choose
|
Rim
|
19" X1.60 motorcycle rim (black/red/golden for choose)
|
Tires
|
19"x2.75 Motorcycle tire or 19" Off road tire for choose
|
Lights and Fenders | Included front and rear lights and alarm system , Front and rear fenders |
Front light and horn | rear light |
alarm system | rear fenders | front fenders |
Optional parts for choose: | |
1 | Front fork Upgrade to KKE front fork +$50 |
2 | Front fork Upgrade to DNM USD-8S front fork +$250 |
3 | Battery Upgrade to 72V 48AH +$200 |
zoom front fork | kke front fork | DNM USD-8S front fork |
UKC1 Colorful Display | Controller |
TEKTRO HD E725 4 Piston Hydraulic brake system | 72V 38.4AH battery |
KKE rear shocx in 1250Lbs | 19"x2.75 motorcycle wheel |
Carton Box: 165x34x88cm
Q1. What is your terms of packing?
A: Generally, we pack our goods in yellow carton box . If you have legally registered patent, we can pack th
goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU,DDP
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the ship cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ; 2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Q9:Can you change configuration for me?
A:No problem, we can change configuration based on your request.
Q10: How long is your delivery time?
A: Generally it is 5-7days if the goods are in stock. or 35~45 days after the sample is confirmed and advance payment is
received,The specific delivery time depends on the items and the quantity of your order.
Suppliers with verified business licenses