Basic Info.
Usage
Dormitories, Temporary Offices
Certification
ISO, CE, BV
Testimonial
"Amazing Experience Working with Longwanyuan"
Technical Innovation
Green Technology
Building Code Adaptability
Suited for Local Building Code
Engineering Resource
10 Architects Squad
Charity Drive
Large Amount Social Donation
Legitimacy
Under The Scrutiny of Sat
Warranty
30-Year Limited Warranty
Fireproof Performance
I Class
Origin
Qingdao Shandong China
Product Description
Feature:
General
Due to temporary nature and ease of transportability Detachable Wall Panel Prefab Home with Steel Foundation(LWY-PH232) shall be single storied romm or multiple rooms of limited size.
Detachable Wall Panel Prefab Home with Steel Foundation(LWY-PH232) shall be of pre-painted light steel construction with steel frames(H-beams etc. ) and roof trusses, to support roofs and floors. They shall be enclosed by either galvanized sheeting, or insulated light weight concrete panels of suitable thickness with reinforcing steel fabric and/or as specified in the Project specification and drawings.
1.1Structural Steel Framework
1.1.1The structure frame work shall be made of steel H beams for main frames and shall be designed as portal. Angles may be used for side girt and roof purlin.
As an alternative to portal construction, roof may also be designed as trusses hinged at top of columns. The frame work shall be designed as fixed at bottom plates and shall be properly anchored with number of bolts in the concrete foundation for fixity.
1.1.2The frame work shall be provided with angle wind bracing at roof and sides for lateral stability for both types of construction.
1.1.3The framework shall consider also erection loads in design and calculation for the same shall be submitted for customer's review and approval.
1.1. 4All steel sections shall be of carbon steel grade
1.1. 5All joints shall be either fully welded as per AWS D1.1 or bolted with high strength bolts. All welding produres and welding qualifications shall be as per AWS D1.1
1.1. 6Prior to any fabrication work, all steel sections shall be blasted from dirt, rust, oil, greast and other impurities by suitable abrasive(grit or grit/shot combination) to achieve a surface cleanliness.
1.1. 7The concrete foundations/footings shall be designed with all the loads.
1.2Metal cladding-walls and roofs
1.2. 1External walls and roof shall comprise of 75mm thick polyurethane insulated sandwich panels with profiled pre-painted galvanized metal sheets of thickness, for the Muslim Style Prefab House of category class I&II as below:
A; Not less than 0.7mm on both sides for class I category(>1 year life); And
B: Not less than 0.5mm on both sides for class II category(<1 year life).
1.2. 2As external weather coat, a nominal 50 micron thick urethan coating pigmented in standard off-white color shall applied on both sides of the metal panels.
1.2. 3Normally the overal wall and roof cladding shall designed to achieve a minium thermal conductivity meeting "U" value of 0.8.
1.2, 4Fasteners shall be stainless steel weatherd drive screws fitted with integral stainless steel washer and sealant washer.
1.2. 5Flasings shall be fabricated from sheet metal compatible with cladding and coated as cladding sheets and shall be customer approved. End closures shall be applied as required for a weather tight installation.
1.2. 6Skirting shall be provided on the interior faces of wall except in pantry and toilet as shown in the drawings and shall be made of 3mm thick, 100mm high PVC material or approved equal. The color shall be decided on site.
1.3Internal walls
1.3. 1Internal walls as partition between room of prefab house of both class I or class II category shall be constructed with sandwich metal sheets having similar specification as in clause1.2. 1(a) or (b) of this standard specification, except it shall be of 50 mm thick.
1.3. 2As an alternative, they may be made of double layered each 16mm thick solid gypsum wall board, fixed in galvanized steel frames suited for partition. Partition shall include hollow metal frames for doors and fixed glass windows.
1.3. 3Metal trims shall be formed from zinc coated steel not lighter than 26 guage.
Address:
Room1801, Longhai Mingzhu Building2, Haier Road178-2, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Construction & Decoration, Light Industry & Daily Use, Tools & Hardware
Management System Certification:
ISO 9001
Company Introduction:
Our company supplys different kinds of products. High quality and favaroble price. We′re pleased to get your Inquiry and we will come back to as soon as possible. We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with good quality at the reasonable price.