Company introduction: Jiangsu Xingxing Drying Equipment Co., Ltd
Purpose It is mainly applied in the laboratory, which is a mixture experiment of different components drying, and between particles or powder and particles. It is an ideal model to explore material mixing process parameters, and is an electromechanical integration experimental device.
Features The HSD series experimental mixer is installed on a movable base. The main components include the frame, the rotary system, the electrical control system, the hopper and so on. The conical mixed hopper mainly consists of the bucket body, the bucket cover and the clamp, and the butterfly valve.
The hopper is mounted on a rotating shaft by a cantilever fixed mode, and can be rotated at 360 degrees. Because the symmetrical axis of the hopper is an angle with the rotary axis of the rotary arm, the three components of the material move in the three-dimensional space of the closed hopper, resulting in strong turning and high shear, achieving a better mixing effect.
The rotary system is the key system to complete the mixing function, in which the rotary motor uses low speed and large torque deceleration motor, which is the power device of the host mixed. The rotary shaft assembly is provided with a sensing element, when the rotary body to set position, the sensor is installed on the frame of a sampling signal, the signal through the PLC system, the hopper read speed and position information, continuous display of speed and cumulative speed in touch, and a stop instruction according to the set time. The hopper stops turning, and the hopper stops at the suitable discharge position under the action of the brake motor.
The electrical control system is mainly divided into two parts, the electric cabinet and the sensor in the frame. The core controller PLC controller and frequency converter is installed in the electric control cabinet, in use process, electrical operation is mainly the operation panel of the electric control cabinet to complete, including printers, touch screen, power switch and emergency stop switch, touch screen can display the running time and speed.
Technical Parameter
Company Show Company introduction: Jiangsu Xingxing Drying Equipment Co., Ltd.
Jiangsu Xingxing Drying Equipment Co.,Ltd has established in 1998 and it covers an area of 15000 square meters, possesses fixed asset of USD 7 million. The products have exported to US, Singapore, India, Ukraine, Russia, Korea and so on. The company have advanced production equipment , excellent technical team and after-sales service.
CERTIFICATE
Package:wooden case
Service: pre-sale service
We Invite customers to visit our company and communicate on technical requirements face to face. sale service
Responsible for debugging the equipment according to customers' requirements of various technical data. Our engineers will train our customers about equipment features and operation key points to make sure the equipment running in the best condition. after-sale service
We provide installation, debugging, maintenance, training and other services; Provide relevant technical data, equipment, software and related GMP certification materials;Set up after-sales service hotline, and arrange personnel to visit customers every year to know more customer needs,like customer operation problems in the process of production equipment. quality promise
Our company promises strictly operate the ISO9001 quality system certification standards and pharmaceutical equipment GMP audit requirements,promise we provide new equipment. Advanced technology,good quality.Equipment operation safe reliable, affordable, easy to maintain.
Equipment warranty period is one year,all the parts for the equipment choose well-known brand.During the warranty when equipment have problem in quality like equipment failure and damage,the company for free maintenance or replacement.
We look forward to cooperating with partners from all over the world to build win-win cooperation relationship in long term. Welcome for your visiting.
Previous Exhibition
FAQ:
1. Q: Please describe your warranty period.
A: 15 months after the equipment is arrived at the destination port or 12 months after the installation and commissioning of the equipment, whichever comes first.
2. Q: Do you provide on-site installation and commissioning?
A: Yes, we do. If on request, we'll provide the guidance of on-site installation and commissioning. Usually one mechanical engineer and one electrical engineer to assist.
3. Q: How about the cost of on-site installation and commissioning guidance?
A: The cost consists of round-trip air tickets, room and board expenses, service cost (labor cost), and site transportation (or directly provided by client), which shall be paid additionally.
4. Q: Are you a factory or a trading company?
A: We are a professional manufacturer. We have own factory and pilot plant for customers to do sample testing.