• Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
  • Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
  • Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
  • Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
  • Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
  • Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction

Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction

After-sales Service: One-Stop Service
Warranty: One Year
Alloy: Non-alloy
Technique: Hot Rolled
Type: Unequal
Standard: GB, ASTM, JIS, AISI, DIN, BS
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Equal Angle Bar
Application
Building Construction
Width
20*20--200*200mm
Special Use
High-Strength Steel Plate
Processing Service
Welding, Cutting, Punching
MOQ
25tons.We Also Can Accept Sample Order.
Package
Standard Sea-Worthy Packing
Grade
Q235B,Q345b,Q420b/C,Q460c,Ss400, S275j0/S275j2
Product Name
Carbon Steel Angle Bar
Shipment Time
Within 15-20 Workdays After Receiving Deposit
Keywords
Angel Steel Bar
Transport Package
N/M
Specification
length: 6-12m
Trademark
Orignal
Origin
China
HS Code
7216990000
Production Capacity
50000tons/Year

Product Description

Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction

Product Description
Standard
AISI, ASTM, BS, DIN, GB, JIS, etc
Material
 A36,S235jr,S275jr, S355jr, St37-2,SS400,Q235,Q345, etc...
Thickness
3-24mm
Equal Angle
Type:
2#-20#
Size:
20-200mm
Thickness:
3.0-24mm
Weight:
0.597-71.168kg/m
Unequal Angle
Type:
2.5*1.6-20*12.5#
Size:
25*16-200*125mm
Long Side:
20-200mm
Short Side:
16-125mm
Thickness:
3.0-24mm
Weight:
1.687-43.588kg/m
Length
1-12m or as customer request
Surface
Oil, Black, Galvanized, Painted
Technique
Hot rolled/Cold rolled/Galvnized
Application
Mechanical&manufacturing,Steel structure,Shipbuilding,Bridging,Automobile classis,Construction,Decoration,etc.
Package
By bundles with steel strips or according to the requirements of customers

Specification
Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction

Product Description

Hot Rolled Angle Line Structural Carbon Steel Angle Bar for ConstructionHot Rolled Angle Line Structural Carbon Steel Angle Bar for ConstructionHot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
Application

Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
Packing & Delivery

Packing Details  : bundle stripe packed or customer's request
Delivery Details : about 25-35 days for average order quantity

Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction

Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction
Why Choose Us?
Our advantages:
1. More than 10 years Professional steel export service. Have own production line.
2. Advanced CNC machine.
3. Low cost&Quick Delivery&High quality.
4. Integrity, strength and quality of products recognized by the industry.
5. Most of our clients are international, the domestic well-known enterprises.
6. Has a complete scientific quality management system. 
7. Can meet any requirements for all kinds of sheet metal processing with advanced equipment.

Hot Rolled Angle Line Structural Carbon Steel Angle Bar for Construction 

FAQ 

Q1: How can I get a sample to check your metal work quality?
Answer: After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value under USD35), as long as you afford the express freight.

Q2: How long can I expect to get the metal work sample?
Answer: After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 5-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.

Q3: What about the leading time for metal work mass production?
Answer: Honestly, it depends on the order quantity. Normally, 15 workdays to 30 workdays after your deposit if no the samples are confirmed.

Q4: What will we do if the metal work quality is not ok?
Answer: If the quality problem is caused by our mistake, we will make replacement order for free or pay the back product charge and handling charge back to you.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now